Contractor Induction Assessment

Contractor Induction Assessment

"*" indicates required fields

We are collecting your personal information in accordance with the Information Privacy Act 2009 for the purpose of processing this submission/form. The information will be only accessed by authorised employees. Your information will not be given to any other person or agency unless you have given us permission, or we are required by law.
Name*

Quiz

You must get 100% in order to complete your induction.
1. I don’t need to report a near miss incident.*
2. Contractors and workers have the responsibility and a duty of care under what legislation?*
3. Smoking is allowed in Council buildings and vehicles.*
4. PPE stands for …*
5. Which coloured signs are mandatory?*
6. Slips, trips and falls will be prevented if the workplace is well kept and workers follow good housekeeping practices.*
7. Due diligence is using the appropriate resources, practices and processes to eliminate or minimise health and safety risks.*
8. In the TRC Safety Management System, contractor control is outlined within element?*
9. Who has responsibility under the National Heavy Vehicle Law (Chain of Responsibility)?*
10. I can use an unguarded machine if I conduct a risk assessment and deem it to be safe.*
11. All hazards that are identified prior to commencing work require a risk assessment and appropriate controls to be implemented to ensure a low level of risk is achieved. What are the top two best controls as detailed in the hierarchy of control?*
12. I should check the SDS before using a hazardous substance.*
13. If I can’t hear a normal conversation around operating equipment, the noise levels may be high enough to require hearing protection.*
14. The TRC Workplace Health and Safety Policy Statement was written because …*
15. Who is responsible for your workplace health and safety?*
16. What actions are required when a contractor enters a TRC depot? Tick all that apply. Select all that apply.*
17. I can use an item of equipment that is out of electrical test date if I check it myself and deem it serviceable.*
18. The risk level should be reduced after completing a risk assessment and implementing controls.*
19. As a contractor on site, what PPE do I need to use around industrial generator-type plant equipment?*
20. How many points of contact must to be maintained when using a ladder?*
21. When handling sharps, I would …*
22. Drugs, other than those prescribed by a doctor or bought over the counter, are not tolerated in the workplace.*
23. As well as the nose and mouth, a hazardous substance can enter the body through the skin.*
24. What is required prior to trenching deeper than 1.5m or working higher than 2m?*
25. If I saw an exposed, coloured, single insulated wire on an electrical cord, I would ...*
26. I am not permitted to work with asbestos unless I am fully trained.*
27. When working in the sun I wear …*
28. I need to use what PPE to cut material that contains silica?*
29. What information do SDSs contain?*
Max. file size: 100 MB.